Port Washington, Ozaukee County, Wisconsin · MISO · operated by Wisconsin Electric Power Co · owned by Wec Energy Group Inc
2023 · headline year
Reported fuel cost$254M2023 · reported deliveries
Capacity in service1,230MW6 units · gas
Net generation8.47TWh2023 · reported
CO₂ emitted3.15Mt2023 · reported to EPA · 150th highest of 6,030 in the US
Rank in Wisconsin#4of 258 · by capacity · #220 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor79%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 58.2 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
11 of 11 shown · 1,230 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST1
268.6
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit ST2
268.6
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit 1CT1
173.1
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit 1CT2
173.1
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit 2CT1
173.1
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit 2CT2
173.1
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit 1
80.0
Bituminous coal
Conventional Steam Coal
1935
Retired 2004
Unit 2
80.0
Bituminous coal
Conventional Steam Coal
1943
Retired 2004
Unit 3
80.0
Bituminous coal
Conventional Steam Coal
1948
Retired 2004
Unit 4
80.0
Bituminous coal
Conventional Steam Coal
1949
Retired 2003
Unit 6
19.6
Distillate oil
Petroleum Liquids
1969
Retired 2003
All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
1,230 MW across 6 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Wec Energy Group Inc (100%) and operated by Wisconsin Electric Power Co, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating units are Unit ST2, Unit 2CT1 and Unit 2CT2 (2005); the newest are Unit ST1, Unit 1CT1 and Unit 1CT2 (2008).
When is it due to retire?
No retirement date has been filed for any operating unit at Port Washington Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $254M in 2023.
How much CO₂ does it emit?
3.15 Mt in 2023, reported to the EPA — the 150th highest of 6,030 US facilities that reported. Up from 932,670 t in 2011.