Manitowoc County, Wisconsin · MISO · operated by NextEra Energy Point Beach LLC
2023 · headline year
The 3rd-largest power plant in Wisconsin by capacity — 1,311 MW, first unit online in 1969.
Capacity in service1,311MW3 units · nuclear + oil
Rank in Wisconsin#3of 258 · by capacity · #188 of 13,147 US
Reported suppliersNot reported2023
Location
Generating units
3 of 3 shown · 1,311 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
643.0
Nuclear
Nuclear
1970
Operating
Unit 2
643.0
Nuclear
Nuclear
1972
Operating
Unit 5
25.0
Distillate oil
Petroleum Liquids
1969
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
1,311 MW across 3 generating units in service — 1,286 MW of nuclear and 25.0 MW of oil.
Who owns and operates it?
Operated by NextEra Energy Point Beach LLC, filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1971. The oldest operating unit is Unit 5 (1969); the newest is Unit 2 (1972).
When is it due to retire?
No retirement date has been filed for any operating unit at Point Beach Nuclear Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by distillate oil.