Maxwell, Colusa County, California · CAISO · operated by Pacific Gas & Electric Co. · owned by Pacific Gas & Electric Co

2023 · headline year
Reported fuel cost$228M2023 · reported deliveries
Capacity in service712MW3 units · gas
Net generation2.95TWh2023 · reported
CO₂ emitted1.17Mt2023 · reported to EPA · 523rd highest of 6,030 in the US
Rank in California#18of 1,713 · by capacity · #468 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor47%2023

Location

Colusa County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 21.2 TBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 712 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit C349.4Natural GasNatural Gas Fired Combined Cycle2010Operating
Unit A181.5Natural GasNatural Gas Fired Combined Cycle2010Operating
Unit B181.5Natural GasNatural Gas Fired Combined Cycle2010Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
PG&ENatural gas21.2n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 154 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Pacific Gas & Electric Co · 100%
Operating utility
Pacific Gas & Electric Co.
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007173
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
56532

Common questions

How big is PG&E Colusa Generating Station?
712 MW across 3 generating units in service.
Who owns and operates it?
Owned by Pacific Gas & Electric Co (100%) and operated by Pacific Gas & Electric Co., filed as investor-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at PG&E Colusa Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $228M in 2023.
How much CO₂ does it emit?
1.17 Mt in 2023, reported to the EPA — the 523rd highest of 6,030 US facilities that reported. Up from 765,671 t in 2011.

Related pages

California energyAll facilities in the state→Pastoria Energy Facility779 MW operating capacity→ Shasta714 MW operating capacity→ Otay Mesa Energy Center, LLC711 MW operating capacity→ Valley Generating Station690 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming