Lebec, Kern County, California · CAISO · operated by Calpine Corp - Pastoria Energy Center · owned by CPN Management LP
2023 · headline year
Fuel spend$254M2023 · estimate
Capacity in service779MW5 units · gas
Net generation4.34TWh2023 · reported
CO₂ emitted1.8Mt2023 · reported to EPA · 343rd highest of 6,030 in the US
Rank in California#16of 1,713 · by capacity · #422 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor64%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 30.5 TBtu · reported · $254M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 779 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST03
185.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit CT01
168.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit CT02
168.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit CT04
168.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit ST05
90.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by CPN Management LP (100%) and operated by Calpine Corp - Pastoria Energy Center, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. Every operating unit came online in 2005.
When is it due to retire?
No retirement date has been filed for any operating unit at Pastoria Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $254M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.8 Mt in 2023, reported to the EPA — the 343rd highest of 6,030 US facilities that reported. Up from 1.14 Mt in 2011.