AMERICAN ENERGY ATLAS
Power·Michigan

PCA, Filer City Mill

Manistee County, Michigan · MISO · operated by PCA, Filer City Mill

2023 · headline year
Capacity in service19.5MW2 units · gas
Net generation92GWh2023 · reported
Rank in Michigan#116of 258 · by capacity · #4,686 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor54%2023

Location

Manistee County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.69 TBtu · reported

Reported fuel consumption, TBtu · 2012–2023

0246201220182023
Reported (through 2023)

Generating units

2 of 2 shown · 19.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG311.5Natural GasNatural Gas Steam Turbine1950Operating
Unit TG28.0Natural GasNatural Gas Steam Turbine1950Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
PCA, Filer City Mill
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
Gas pipeline
DTE Gas Company
EIA plant ID
58066

Common questions

How big is PCA, Filer City Mill?
19.5 MW across 2 generating units in service.
Who owns and operates it?
Operated by PCA, Filer City Mill, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1950. Every operating unit came online in 1950.
When is it due to retire?
No retirement date has been filed for any operating unit at PCA, Filer City Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Also at this site

TES Filer City StationSame site · operating→

Related pages

Michigan energyAll facilities in the state→Willford Solar, LLC20.0 MW operating capacity→ Turrill Solar Farm19.6 MW operating capacity→ St. Clair18.5 MW operating capacity→ Kent County Waste To Energy Facility18.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming