Industrial + power·Michigan

Kent County Waste To Energy Facility

Grand Rapids, Kent County, Michigan · MISO · operated by Kent County · owned by Kent County of (inc)

2023 · headline year
Capacity in service18.0MW1 unit · waste
Net generation93.4GWh2023 · reported
CO₂ emitted73,486t2023 · reported to EPA · 2,927th highest of 6,030 in the US
Rank in Michigan#118of 258 · by capacity · #4,745 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor59%2023

Location

Kent County · MISO · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 1.96 TBtu · reported

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 18.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN118.0Municipal solid wasteMunicipal Solid Waste1989Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Kent County of (inc) · 100%
Operating utility
Kent County
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1003387
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50860

Common questions

How big is Kent County Waste To Energy Facility?
18.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Kent County of (inc) (100%) and operated by Kent County, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Kent County Waste To Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned other fuels.
How much CO₂ does it emit?
73,486 t in 2023, reported to the EPA — the 2,927th highest of 6,030 US facilities that reported. Down from 81,423 t in 2011.

Related pages

Michigan energyAll facilities in the state→PCA, Filer City Mill19.5 MW operating capacity→ St. Clair18.5 MW operating capacity→ Hodenpyl17.0 MW operating capacity→ Western Michigan University16.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming