Fuel spend$8.82M2023 · estimate
Capacity in service70.0MW1 unit · coal
Net generation318GWh2023 · reported
CO₂ emitted310,831t2023 · reported to EPA · 1,214th highest of 6,030 in the US
Rank in Michigan#63of 258 · by capacity · #3,069 (tied) of 13,147 US
Capacity factor52%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.
See the engineering record →
How big is TES Filer City Station?
70.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at TES Filer City Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal, natural gas and biomass.
How much does it spend on fuel?
An estimated $8.82M in 2023 — coal $6.74M and natural gas $2.07M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
310,831 t in 2023, reported to the EPA — the 1,214th highest of 6,030 US facilities that reported. Down from 542,014 t in 2011.