Oxnard, Ventura County, California · CAISO · operated by Ormond Beach Power, LLC · owned by Genon Holdings LLC
2023 · headline year
Fuel spend$26.5M2023 · estimate
Capacity in service1,612MW2 units · gas
Net generation257GWh2023 · reported
CO₂ emitted169,890t2023 · reported to EPA · 1,691st highest of 6,030 in the US
Rank in California#6of 1,713 · by capacity · #135 of 13,147 US
Reported suppliers12023 · 9 deliveries
Capacity factor2%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 3.19 TBtu · reported · $26.5M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
2 of 2 shown · 1,612 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
806.0
Natural Gas
Natural Gas Steam Turbine
1971
Operating
Unit 2
806.0
Natural Gas
Natural Gas Steam Turbine
1973
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 125 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.