Oconee County, South Carolina · DUK · operated by Duke Energy Carolinas, LLC
2023 · headline year
The largest power plant in South Carolina by capacity — 2,667 MW, first unit online in 1973, a uprate filed for 2025.
Capacity in service2,667MW3 units · nuclear
Rank in South Carolina#1of 204 · by capacity · #22 of 13,147 US
Location
Generating units
3 of 3 shown · 2,667 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
893.3
Nuclear
Nuclear
1974
Operating
Unit 1
886.7
Nuclear
Nuclear
1973
Operating
Unit 2
886.7
Nuclear
Nuclear
1974
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Operated by Duke Energy Carolinas, LLC, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1974. The oldest operating unit is Unit 1 (1973); the newest are Unit 3 and Unit 2 (1974).
When is it due to retire?
No retirement date has been filed for any operating unit at Oconee. An absent date means none is currently filed, not that the plant will run indefinitely.