York County, South Carolina · DUK · operated by Duke Energy Carolinas, LLC
2023 · headline year
The 3rd-largest power plant in South Carolina by capacity — 2,410 MW, first unit online in 1985.
Capacity in service2,410MW2 units · nuclear
Rank in South Carolina#3of 204 · by capacity · #42 of 13,147 US
Location
Generating units
2 of 2 shown · 2,410 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
1,205.1
Nuclear
Nuclear
1985
Operating
Unit 2
1,205.1
Nuclear
Nuclear
1986
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; ownership stakes where a unit is jointly held.
Duke Energy Carolinas, LLC 38% of 1 unit North Carolina El Member Corp 62% of 1 unit North Carolina Mun Power Agny #1 75% of 1 unit Piedmont Municipal Power Agny 25% of 1 unit
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
DUK
NERC region
SERC
EIA plant ID
6036
Common questions
How big is Catawba?
2,410 MW across 2 generating units in service.
Who owns and operates it?
Operated by Duke Energy Carolinas, LLC, filed as investor-owned utility. 4 owner stakes are filed on jointly held units.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. The oldest operating unit is Unit 1 (1985); the newest is Unit 2 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Catawba. An absent date means none is currently filed, not that the plant will run indefinitely.