AMERICAN ENERGY ATLAS
Power·California

Malaga Power, LLC

Fresno, Fresno County, California · CAISO · operated by CalPeak Power, LLC · owned by Middle River Power LLC

2023 · headline year
Fuel spend$928,3872023 · estimate
Capacity in service121MW2 units · gas
Net generation9.92GWh2023 · reported
CO₂ emitted6,030t2023 · reported to EPA · 5,863rd highest of 6,030 in the US
Rank in California#211 (tied)of 1,713 · by capacity · #2,111 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor1%2023

Location

Fresno County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 111,523 MMBtu · reported · $928,387 est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 121 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT-160.5Natural GasNatural Gas Fired Combustion Turbine2005Operating
Unit GT-260.5Natural GasNatural Gas Fired Combustion Turbine2005Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Middle River Power LLC · 100%
Operating utility
CalPeak Power, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000458
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
56239

Common questions

How big is Malaga Power, LLC?
121 MW across 2 generating units in service.
Who owns and operates it?
Owned by Middle River Power LLC (100%) and operated by CalPeak Power, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. Every operating unit came online in 2005.
When is it due to retire?
No retirement date has been filed for any operating unit at Malaga Power, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $928,387 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
6,030 t in 2023, reported to the EPA — the 5,863rd highest of 6,030 US facilities that reported. Down from 33,378 t in 2011.

Related pages

California energyAll facilities in the state→Niland Gas Turbine Plant121 MW operating capacity→ Ripon Generation Station121 MW operating capacity→ Parker Dam120 MW operating capacity→ Rabbitbrush Solar, LLC120 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming