Power·California

Niland Gas Turbine Plant

Niland, Imperial County, California · IID · operated by Imperial Irrigation District · owned by Imperial Irrigation District

2023 · headline year
Fuel spend$7.25M2023 · estimate
Capacity in service121MW2 units · gas
Net generation88.4GWh2023 · reported
CO₂ emitted46,279t2023 · reported to EPA · 3,840th highest of 6,030 in the US
Rank in California#211 (tied)of 1,713 · by capacity · #2,111 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor8%2023

Location

Imperial County · IID · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 870,483 MMBtu · reported · $7.25M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 121 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 160.5Natural GasNatural Gas Fired Combustion Turbine2008Operating
Unit 260.5Natural GasNatural Gas Fired Combustion Turbine2008Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Imperial Irrigation District · 100%
Operating utility
Imperial Irrigation District
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000541
Balancing authority
IID
NERC region
WECC
EIA plant ID
56569

Common questions

How big is Niland Gas Turbine Plant?
121 MW across 2 generating units in service.
Who owns and operates it?
Owned by Imperial Irrigation District (100%) and operated by Imperial Irrigation District, filed as political subdivision.
Which grid does it sell into?
IID (Imperial Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. Every operating unit came online in 2008.
When is it due to retire?
No retirement date has been filed for any operating unit at Niland Gas Turbine Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $7.25M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
46,279 t in 2023, reported to the EPA — the 3,840th highest of 6,030 US facilities that reported. Up from 21,190 t in 2011.

Also at this site

Imperial Valley Solar Company 1 LLCNearby, same operator · operating→

Related pages

California energyAll facilities in the state→Tumbleweed Energy Storage125 MW operating capacity→ Middle Fork122 MW operating capacity→ Ripon Generation Station121 MW operating capacity→ Malaga Power, LLC121 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming