AMERICAN ENERGY ATLAS
Industrial + power·Florida

Jax LNG

Jacksonville, Duval County, Florida · JEA · operated by Jax LNG · owned by Pivotal LNG and Seaside LNG

2023 · headline year
Capacity in service12.6MW5 units · gas
Net generation30.5GWh2023 · reported
CO₂ emitted30,427t2023 · reported to EPA · 4,718th highest of 6,030 in the US
Rank in Florida#245 (tied)of 310 · by capacity · #5,109 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor28%2023

Location

Duval County · JEA · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 251,402 MMBtu · reported

Reported fuel consumption, MMBtu · 2022–23

0200,000400,000600,00020222023
Reported (through 2023)

Generating units

5 of 5 shown · 12.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 11502.6Natural GasNatural Gas Internal Combustion Engine2023Operating
Unit 11102.5Natural GasNatural Gas Internal Combustion Engine2018Operating
Unit 11202.5Natural GasNatural Gas Internal Combustion Engine2018Operating
Unit 11302.5Natural GasNatural Gas Internal Combustion Engine2018Operating
Unit 11402.5Natural GasNatural Gas Internal Combustion Engine2018Operating

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Jax LNG
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Petroleum and Natural Gas Systems
EPA facility ID
1013818
Balancing authority
JEA
NERC region
SERC
EIA plant ID
66392

Common questions

How big is Jax LNG?
12.6 MW across 5 generating units in service.
Who owns and operates it?
Owned by Pivotal LNG and Seaside LNG and operated by Jax LNG, filed as industrial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. The oldest operating units are Unit 1110, Unit 1120, Unit 1130 and Unit 1140 (2018); the newest is Unit 1150 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Jax LNG. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much CO₂ does it emit?
30,427 t in 2023, reported to the EPA — the 4,718th highest of 6,030 US facilities that reported.

Related pages

Florida energyAll facilities in the state→Covanta Lake County Energy15.5 MW operating capacity→ Pea Ridge14.1 MW operating capacity→ Jacksonville Solar12.6 MW operating capacity→ Gainesville Regional Utilities, South Energy Center11.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming