AMERICAN ENERGY ATLAS
Power·Florida

Covanta Lake County Energy

Lake County, Florida · FPC · operated by Covanta Lake Inc

2023 · headline year
Capacity in service15.5MW1 unit · waste
Net generation82.4GWh2023 · reported
Rank in Florida#243of 310 · by capacity · #4,896 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor61%2023

Location

Lake County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

99% Other fuels · 1.67 TBtu · reported1% Natural gas · 0.0209 TBtu · reported

Other fuels supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 15.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN115.5Municipal solid wasteMunicipal Solid Waste1990Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Covanta Lake Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
FPC
NERC region
SERC
EIA plant ID
50629

Common questions

How big is Covanta Lake County Energy?
15.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Covanta Lake Inc, filed as independent power producer.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at Covanta Lake County Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels and natural gas.

Also at this site

Covanta Lake II IncSame site→

Related pages

Florida energyAll facilities in the state→Swift Creek Chemical Complex18.8 MW operating capacity→ Sub 1218.6 MW operating capacity→ Pea Ridge14.1 MW operating capacity→ Jax LNG12.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming