Lake County, Florida · FPC · operated by Covanta Lake Inc
2023 · headline year
Capacity in service15.5MW1 unit · waste
Net generation82.4GWh2023 · reported
Rank in Florida#243of 310 · by capacity · #4,896 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor61%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
99% Other fuels · 1.67 TBtu · reported1% Natural gas · 0.0209 TBtu · reported
Other fuels supplies 99% of the fuel energy it burned in 2023.
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
1 of 1 shown · 15.5 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
15.5
Municipal solid waste
Municipal Solid Waste
1990
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.
Operated by Covanta Lake Inc, filed as independent power producer.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at Covanta Lake County Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?