Gainesville Regional Utilities, South Energy Center

Gainesville, Alachua County, Florida · GVL · operated by Gainesville Regional Utilities · owned by City of Gainesville Florida

2023 · headline year
Fuel spend$1.6M2023 · estimate
Capacity in service11.5MW2 units · gas
Net generation44GWh2023 · reported
CO₂ emitted24,895t2023 · reported to EPA · 5,150th highest of 6,030 in the US
Rank in Florida#247of 310 · by capacity · #5,221 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor44%2023

Location

Alachua County · GVL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 399,764 MMBtu · reported · $1.6M est.

CO₂ emitted, t · 2011–2023

010,00020,00030,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 11.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit REG17.4Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit GT14.1Natural GasNatural Gas Fired Combustion Turbine2009Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Gainesville Florida · 100%
Operating utility
Gainesville Regional Utilities
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1002404
Balancing authority
GVL
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
56518

Common questions

How big is Gainesville Regional Utilities, South Energy Center?
11.5 MW across 2 generating units in service.
Who owns and operates it?
Owned by City of Gainesville Florida (100%) and operated by Gainesville Regional Utilities, filed as municipally owned utility.
Which grid does it sell into?
GVL (Gainesville Regional Utilities) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. The oldest operating unit is Unit GT1 (2009); the newest is Unit REG1 (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Gainesville Regional Utilities, South Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.6M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
24,895 t in 2023, reported to the EPA — the 5,150th highest of 6,030 US facilities that reported. Up from 20,627 t in 2011.

Related pages

Florida energyAll facilities in the state→Jax LNG12.6 MW operating capacity→ Jacksonville Solar12.6 MW operating capacity→ CSL Gas Recovery11.2 MW operating capacity→ Trenton11.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming