Broward County, Florida · FPL · operated by WM Renewable Energy LLC
2023 · headline year
Capacity in service11.2MW4 units · biomass
Net generation40GWh2023 · reported
Rank in Florida#248of 310 · by capacity · #5,241 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor41%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Landfill gas · 908,993 MMBtu · reported
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 11.2 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
3.0
Landfill gas
Landfill Gas
1989
Operating
Unit GEN2
3.0
Landfill gas
Landfill Gas
1989
Operating
Unit GEN3
3.0
Landfill gas
Landfill Gas
1989
Operating
Unit GEN4
2.2
Landfill gas
Landfill Gas
2000
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating units are Unit GEN1, Unit GEN2 and Unit GEN3 (1989); the newest is Unit GEN4 (2000).
When is it due to retire?
No retirement date has been filed for any operating unit at CSL Gas Recovery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?