AMERICAN ENERGY ATLAS
Power·California

Henrietta Peaker Plant

Lemoore, Kings County, California · CAISO · operated by MRP San Joaquin Energy LLC. · owned by Middle River Power LLC

2023 · headline year
Fuel spend$327,4572023 · estimate
Capacity in service98.0MW2 units · gas
Net generation3.54GWh2023 · reported
CO₂ emitted2,048t2023 · reported to EPA · 5,947th highest of 6,030 in the US
Rank in California#260of 1,713 · by capacity · #2,527 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor0%2023

Location

Kings County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 39,336 MMBtu · reported · $327,457 est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 98.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit HPP149.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit HPP249.0Natural GasNatural Gas Fired Combustion Turbine2002Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Middle River Power LLC · 100%
Operating utility
MRP San Joaquin Energy LLC.
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000283
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
55807

Common questions

How big is Henrietta Peaker Plant?
98.0 MW across 2 generating units in service.
Who owns and operates it?
Owned by Middle River Power LLC (100%) and operated by MRP San Joaquin Energy LLC., filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. Every operating unit came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at Henrietta Peaker Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $327,457 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2,048 t in 2023, reported to the EPA — the 5,947th highest of 6,030 US facilities that reported. Down from 9,964 t in 2011.

Also at this site

Henrietta D Energy Storage LLCSame site · operating→

Related pages

California energyAll facilities in the state→Larkspur Energy Faciity99.8 MW operating capacity→ Rising Tree Wind Farm III99.0 MW operating capacity→ Balch 297.2 MW operating capacity→ Moccasin96.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming