AMERICAN ENERGY ATLAS
Power·California

Larkspur Energy Faciity

San Diego, San Diego County, California · CAISO · operated by Diamond Generating Corporation · owned by Mitsubishi Corp (americas)

2023 · headline year
Fuel spend$3.5M2023 · estimate
Capacity in service99.8MW2 units · gas
Net generation38.7GWh2023 · reported
CO₂ emitted22,144t2023 · reported to EPA · 5,328th highest of 6,030 in the US
Rank in California#258of 1,713 · by capacity · #2,483 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor4%2023

Location

San Diego County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 419,846 MMBtu · reported · $3.5M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 99.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CTG149.9Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit CTG249.9Natural GasNatural Gas Fired Combustion Turbine2001Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Mitsubishi Corp (americas) · 100%
Operating utility
Diamond Generating Corporation
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000147
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
55542

Common questions

How big is Larkspur Energy Faciity?
99.8 MW across 2 generating units in service.
Who owns and operates it?
Owned by Mitsubishi Corp (americas) (100%) and operated by Diamond Generating Corporation, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2001. Every operating unit came online in 2001.
When is it due to retire?
No retirement date has been filed for any operating unit at Larkspur Energy Faciity. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $3.5M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
22,144 t in 2023, reported to the EPA — the 5,328th highest of 6,030 US facilities that reported. Up from 19,797 t in 2011.

Related pages

California energyAll facilities in the state→Sandrini Solar 100100 MW operating capacity→ Saticoy100 MW operating capacity→ Rising Tree Wind Farm III99.0 MW operating capacity→ Henrietta Peaker Plant98.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming