AMERICAN ENERGY ATLAS
Power·Connecticut

CMEEC - Norwich Stott St Solar Hybrid

New London County, Connecticut · ISO-NE · operated by Tesla Inc.

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service4.3MW2 units · solar + storage
Rank in Connecticut#72 (tied)of 168 · by capacity · #7,945 (tied) of 13,147 US

Location

New London County · ISO-NE · NPCC

Generating units

2 of 2 shown · 4.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit PV13.5SolarSolar Photovoltaic2016Operating
Unit BA10.8StorageBatteries2016Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Tesla Inc.
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
60609

Common questions

How big is CMEEC - Norwich Stott St Solar Hybrid?
4.3 MW across 2 generating units in service — 3.5 MW of solar and 0.8 MW of storage.
Who owns and operates it?
Operated by Tesla Inc., filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. Every operating unit came online in 2016.
When is it due to retire?
No retirement date has been filed for any operating unit at CMEEC - Norwich Stott St Solar Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (3.5 MW) and Batteries (0.8 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Connecticut energyAll facilities in the state→Frito-Lay4.6 MW operating capacity→ Fairfield University CHP Plant4.5 MW operating capacity→ CMEEC - Polaris Park Solar Hybrid4.3 MW operating capacity→ Danbury Hospital Cogen Plant4.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming