Frito-Lay

Killingly (dayville), Windham County, Connecticut · ISO-NE · operated by Frito Lay Incorporated Dayville · owned by Pepsico Inc

2023 · headline year
Fuel spend$6.5M2023 · estimate
Capacity in service4.6MW1 unit · gas
Net generation22.3GWh2023 · reported
CO₂ emitted40,905t2023 · reported to EPA · 4,085th highest of 6,030 in the US
Rank in Connecticut#70of 168 · by capacity · #7,766 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor55%2023

Location

Windham County · ISO-NE · NPCC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 351,418 MMBtu · reported · $6.49M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 4.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit COGEN4.6Natural GasNatural Gas Fired Combustion Turbine2009Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Pepsico Inc · 100%
Operating utility
Frito Lay Incorporated Dayville
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1004983
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
58664

Common questions

How big is Frito-Lay?
4.6 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Pepsico Inc (100%) and operated by Frito Lay Incorporated Dayville, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Frito-Lay. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $6.5M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
40,905 t in 2023, reported to the EPA — the 4,085th highest of 6,030 US facilities that reported. Up from 40,755 t in 2011.

Related pages

Connecticut energyAll facilities in the state→Wind Colebrook South5.0 MW operating capacity→ Southington Solar One4.7 MW operating capacity→ Fairfield University CHP Plant4.5 MW operating capacity→ CMEEC - Norwich Stott St Solar Hybrid4.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming