AMERICAN ENERGY ATLAS
Power·Connecticut

Danbury Hospital Cogen Plant

Fairfield County, Connecticut · ISO-NE · operated by Danbury Hospital

2023 · headline year
Fuel spend$2.97M2023 · estimate
Capacity in service4.3MW1 unit · gas
Net generation26.3GWh2023 · reported
Rank in Connecticut#72 (tied)of 168 · by capacity · #7,945 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor70%2023

Location

Fairfield County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 352,730 MMBtu · reported · $2.97M est.

Reported fuel consumption, MMBtu · 2012–2023

0200,000400,000600,000201220182023
Reported (through 2023)

Generating units

1 of 1 shown · 4.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN14.3Natural GasNatural Gas Fired Combustion Turbine2011Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Danbury Hospital
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Algonquin Gas Transmission Company
EIA plant ID
58152

Common questions

How big is Danbury Hospital Cogen Plant?
4.3 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Danbury Hospital, filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2011.
When is it due to retire?
No retirement date has been filed for any operating unit at Danbury Hospital Cogen Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.97M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Connecticut energyAll facilities in the state→CMEEC - Norwich Stott St Solar Hybrid4.3 MW operating capacity→ CMEEC - Polaris Park Solar Hybrid4.3 MW operating capacity→ Hartford Steam - Columbus Plant4.0 MW operating capacity→ Antares-GRE 314 East Lyme LLC4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming