The 3rd-largest reported CO₂ emitter among facilities in Oklahoma — 2.61 Mt in 2023, 100% natural gas by fuel energy in 2023, first unit online in 2000, newest in 2011.
Reported fuel cost$116M2023 · reported deliveries
Capacity in service1,070MW6 units · gas
Net generation6.92TWh2023 · reported
CO₂ emitted2.61Mt2023 · reported to EPA · 211th highest of 6,030 in the US
Rank in Oklahoma#10of 139 · by capacity · #285 of 13,147 US
Reported suppliers252023 · 193 deliveries
Capacity factor74%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 50.1 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,070 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
182.8
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit 6
182.8
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
Unit 1
176.0
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit 2
176.0
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit 4
176.0
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
Unit 5
176.0
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 25 suppliers. Subscribe to see all 25, every one of the 2,071 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
AECI (Associated Electric Cooperative, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. The oldest operating units are Unit 3, Unit 1 and Unit 2 (2000); the newest are Unit 6, Unit 4 and Unit 5 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at Chouteau Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 25 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $116M in 2023.
How much CO₂ does it emit?
2.61 Mt in 2023, reported to the EPA — the 211th highest of 6,030 US facilities that reported. Up from 782,964 t in 2011.