Jenks, Tulsa County, Oklahoma · SPP · operated by Green Country OP Services LLC · owned by J-Power USA Development Co LTD
2023 · headline year
Fuel spend$84.4M2023 · estimate
Capacity in service904MW6 units · gas
Net generation3.85TWh2023 · reported
CO₂ emitted1.51Mt2023 · reported to EPA · 412th highest of 6,030 in the US
Rank in Oklahoma#12of 139 · by capacity · #348 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor49%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 28.4 TBtu · reported · $84.4M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 904 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit CTG1
179.3
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CTG2
179.3
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CTG3
179.3
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit STG1
122.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit STG2
122.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit STG3
122.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 157 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by J-Power USA Development Co LTD (100%) and operated by Green Country OP Services LLC, filed as independent power producer.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. Every operating unit came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at Green Country Energy, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $84.4M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.51 Mt in 2023, reported to the EPA — the 412th highest of 6,030 US facilities that reported. Up from 876,177 t in 2011.