Jenks, Tulsa County, Oklahoma · SPP · operated by Public Service Co of Oklahoma · owned by American Electric Power Co Inc
2023 · headline year
Fuel spend$40.8M2023 · estimate
Capacity in service1,122MW5 units · gas + oil
Net generation1.12TWh2023 · reported
CO₂ emitted819,038t2023 · reported to EPA · 699th highest of 6,030 in the US
Rank in Oklahoma#9of 139 · by capacity · #261 of 13,147 US
Reported suppliers212023 · 121 deliveries
Capacity factor11%2023
Location
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 1,122 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
473.0
Natural Gas
Natural Gas Steam Turbine
1974
Operating
Unit 2
473.0
Natural Gas
Natural Gas Steam Turbine
1976
Operating
Unit 3
86.5
Natural Gas
Natural Gas Fired Combustion Turbine
2008
Operating
Unit 4
86.5
Natural Gas
Natural Gas Fired Combustion Turbine
2008
Operating
Unit IC1
2.7
Distillate oil
Petroleum Liquids
1976
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 21 suppliers. Subscribe to see all 21, every one of the 2,362 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,122 MW across 5 generating units in service — 1,119 MW of natural gas and 2.7 MW of oil.
Who owns and operates it?
Owned by American Electric Power Co Inc (100%) and operated by Public Service Co of Oklahoma, filed as investor-owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1980. The oldest operating unit is Unit 1 (1974); the newest are Unit 3 and Unit 4 (2008).
When is it due to retire?
No retirement date has been filed for any operating unit at Riverside (4940). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas and distillate oil. Natural gas came from 21 suppliers in 2023.
How much does it spend on fuel?
An estimated $40.8M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
819,038 t in 2023, reported to the EPA — the 699th highest of 6,030 US facilities that reported. Down from 1.18 Mt in 2011.