AMERICAN ENERGY ATLAS
Power·Connecticut

Backus Microgrid Project

New London County, Connecticut · ISO-NE · operated by Connecticut Mun Elec Engy Coop

2023 · headline year
Fuel spend$224,7222023 · estimate
Capacity in service10.4MW4 units · oil
Net generation1.02GWh2023 · reported
Rank in Connecticut#46 (tied)of 168 · by capacity · #5,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

New London County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 10,186 MMBtu · reported · $224,722 est.

Reported fuel consumption, MMBtu · 2014–23

010,00020,00030,000201420182023
Reported (through 2023)

Generating units

4 of 4 shown · 10.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BMP12.6Distillate oilPetroleum Liquids2014Operating
Unit BMP22.6Distillate oilPetroleum Liquids2014Operating
Unit BMP32.6Distillate oilPetroleum Liquids2014Operating
Unit BMP42.6Distillate oilPetroleum Liquids2014Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Connecticut Mun Elec Engy Coop
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
59415

Common questions

How big is Backus Microgrid Project?
10.4 MW across 4 generating units in service.
Who owns and operates it?
Operated by Connecticut Mun Elec Engy Coop, filed as cooperative.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. Every operating unit came online in 2014.
When is it due to retire?
No retirement date has been filed for any operating unit at Backus Microgrid Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $224,722 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Connecticut energyAll facilities in the state→SR North Stonington12.0 MW operating capacity→ Hartford Hospital Cogeneration Facility11.8 MW operating capacity→ Fort Hill 1, 2, 3 & 410.4 MW operating capacity→ Stamford Health10.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming