Fuel spend$3.25M2023 · estimate
Capacity in service11.8MW3 units · gas
Net generation43.8GWh2023 · reported
CO₂ emitted39,791t2023 · reported to EPA · 4,148th highest of 6,030 in the US
Rank in Connecticut#45of 168 · by capacity · #5,195 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor42%2023

Location

Hartford County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 847,202 MMBtu · reported · $3.22M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 11.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN36.2Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GEN24.2Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GEN41.4Natural GasOther Natural Gas2014Operating
Unit GEN66.0Natural GasNatural Gas Fired Combustion Turbine2026Proposed
Unit GEN55.5Natural GasNatural Gas Fired Combined Cycle2026Proposed

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →
UnitEventWhenMW
Unit GEN5new unit20265.5 MW
Unit GEN6new unit20266.0 MW
Unit GEN3retirement2027-126.2 MW
Unit GEN4retirement2029-061.4 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Cartier Energy LLC · 100%
Operating utility
Cartier Energy, LLC
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1010343
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
52061

Common questions

How big is Hartford Hospital Cogeneration Facility?
11.8 MW across 3 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Cartier Energy LLC (100%) and operated by Cartier Energy, LLC, filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating units are Unit GEN3 and Unit GEN2 (1988); the newest is Unit GEN4 (2014).
When is it due to retire?
Planned retirement dates are filed for 2 of 3 operating units: Unit GEN3 (2027) and Unit GEN4 (2029).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $3.25M in 2023 — natural gas $3.22M and oil & petroleum $33,027. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
39,791 t in 2023, reported to the EPA — the 4,148th highest of 6,030 US facilities that reported. Down from 43,510 t in 2011.

Related pages

Connecticut energyAll facilities in the state→Derby Fuel Cell14.0 MW operating capacity→ SR North Stonington12.0 MW operating capacity→ Backus Microgrid Project10.4 MW operating capacity→ Fort Hill 1, 2, 3 & 410.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming