AMERICAN ENERGY ATLAS
Power·Connecticut

Stamford Health

Fairfield County, Connecticut · ISO-NE · operated by Stamford Health Systems, Inc.

2023 · headline year
Fuel spend$731,0232023 · estimate
Capacity in service10.4MW9 units · oil + gas
Rank in Connecticut#46 (tied)of 168 · by capacity · #5,337 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Fairfield County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 84,185 MMBtu · reported · $709,680 est.1% Oil & petroleum · 886 MMBtu · reported · $21,344 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2020–23

030,00060,00090,000202020222023
Reported (through 2023)

Generating units

9 of 9 shown · 10.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 152.5Distillate oilPetroleum Liquids2014Operating
Unit 162.5Distillate oilPetroleum Liquids2014Operating
Unit FC2.0Natural GasOther Natural Gas2023Operating
Unit 40.8Distillate oilPetroleum Liquids2001Operating
Unit 50.8Distillate oilPetroleum Liquids2001Operating
Unit 130.5Distillate oilPetroleum Liquids2007Operating
Unit 70.5Distillate oilPetroleum Liquids1984Operating
Unit 10.4Distillate oilPetroleum Liquids2001Operating
Unit 140.4Distillate oilPetroleum Liquids1984Operating

All 9 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Stamford Health Systems, Inc.
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
64515

Common questions

How big is Stamford Health?
10.4 MW across 9 generating units in service — 8.4 MW of oil and 2.0 MW of natural gas.
Who owns and operates it?
Operated by Stamford Health Systems, Inc., filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. The oldest operating units are Unit 7 and Unit 14 (1984); the newest is Unit FC (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Stamford Health. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $731,023 in 2023 — natural gas $709,680 and oil & petroleum $21,344. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Connecticut energyAll facilities in the state→Backus Microgrid Project10.4 MW operating capacity→ Fort Hill 1, 2, 3 & 410.4 MW operating capacity→ Generate Colchester Fuel Cells, LLC10.0 MW operating capacity→ Sikorsky Aircraft CHP9.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming