AMERICAN ENERGY ATLAS
Power·Florida

Anclote Power Plant

Holiday, Pasco County, Florida · FPC · operated by Duke Energy Florida, LLC · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$85.5M2023 · reported deliveries
Capacity in service1,112MW2 units · gas
Net generation1.74TWh2023 · reported
CO₂ emitted1.15Mt2023 · reported to EPA · 528th highest of 6,030 in the US
Rank in Florida#24of 310 · by capacity · #266 of 13,147 US
Reported suppliers112023 · 26 deliveries
Capacity factor18%2023

Location

Pasco County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 21.6 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 1,112 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1556.2Natural GasNatural Gas Steam Turbine1974Operating
Unit 2556.2Natural GasNatural Gas Steam Turbine1978Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 11 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
BPNatural gas3.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 11 suppliers. Subscribe to see all 11, every one of the 305 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 11 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Florida, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007246
Balancing authority
FPC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
8048

Common questions

How big is Anclote Power Plant?
1,112 MW across 2 generating units in service.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Florida, LLC, filed as investor-owned utility.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1976. The oldest operating unit is Unit 1 (1974); the newest is Unit 2 (1978).
When is it due to retire?
No retirement date has been filed for any operating unit at Anclote Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 11 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $85.5M in 2023.
How much CO₂ does it emit?
1.15 Mt in 2023, reported to the EPA — the 528th highest of 6,030 US facilities that reported. Down from 1.18 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Curtis H. Stanton Energy Center1,262 MW operating capacity→ Intercession City Power Plant1,197 MW operating capacity→ Oleander Power Project994 MW operating capacity→ Midulla Generating Station853 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming