Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 151 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Nextera Energy Inc (100%) and operated by Oleander Holdings LLC, filed as independent power producer.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. The oldest operating units are Unit OG1, Unit OG2, Unit OG3 and Unit OG4 (2002); the newest is Unit OG5 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Oleander Power Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $16.8M in 2023 — natural gas $16.5M and oil & petroleum $297,359. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
217,059 t in 2023, reported to the EPA — the 1,463rd highest of 6,030 US facilities that reported. Up from 212,681 t in 2011.