AMERICAN ENERGY ATLAS
Industrial + power·New York

Wheelabrator Westchester LP

Peekskill, Westchester County, New York · NYISO · operated by Wheelabrator Environmental Systems · owned by Wheelabrator Technologies Holdings Inc

2023 · headline year
Fuel spend$13M2023 · estimate
Capacity in service59.7MW1 unit · waste
Net generation399GWh2023 · reported
CO₂ emitted297,790t2023 · reported to EPA · 1,238th highest of 6,030 in the US
Rank in New York#96of 1,018 · by capacity · #3,269 of 13,147 US
Reported suppliersNot reported2023
Capacity factor76%2023

Location

Westchester County · NYISO · NPCC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 7.29 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 59.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN159.7Municipal solid wasteMunicipal Solid Waste1984Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wheelabrator Environmental Systems
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004244
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
50882

Common questions

How big is Wheelabrator Westchester LP?
59.7 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Wheelabrator Technologies Holdings Inc (100%) and operated by Wheelabrator Environmental Systems, filed as commercial.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984.
When is it due to retire?
No retirement date has been filed for any operating unit at Wheelabrator Westchester LP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned other fuels.
How much does it spend on fuel?
An estimated $13M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
297,790 t in 2023, reported to the EPA — the 1,238th highest of 6,030 US facilities that reported. Up from 235,935 t in 2011.

Related pages

New York energyAll facilities in the state→Jamaica Bay Peaking60.5 MW operating capacity→ Indeck-Yerkes Energy Center59.9 MW operating capacity→ Curtis Palmer Hydroelectric59.0 MW operating capacity→ Indeck-Oswego Energy Center57.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming