Indeck-Yerkes Energy Center

Tonawanda, Erie County, New York · NYISO · operated by Indeck-Yerkes Ltd Partnership · owned by Indeck Energy Services Inc

2023 · headline year
Fuel spend$1.9M2023 · estimate
Capacity in service59.9MW2 units · gas
Net generation30.8GWh2023 · reported
CO₂ emitted32,861t2023 · reported to EPA · 4,552nd highest of 6,030 in the US
Rank in New York#95of 1,018 · by capacity · #3,263 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor6%2023

Location

Erie County · NYISO · NPCC

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 59.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN140.6Natural GasNatural Gas Fired Combined Cycle1989Operating
Unit GEN219.3Natural GasNatural Gas Fired Combined Cycle1989Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Indeck Energy Services Inc · 100%
Operating utility
Indeck-Yerkes Ltd Partnership
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001242
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
50451

Common questions

How big is Indeck-Yerkes Energy Center?
59.9 MW across 2 generating units in service.
Who owns and operates it?
Owned by Indeck Energy Services Inc (100%) and operated by Indeck-Yerkes Ltd Partnership, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989. Every operating unit came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Indeck-Yerkes Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas.
How much does it spend on fuel?
An estimated $1.9M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
32,861 t in 2023, reported to the EPA — the 4,552nd highest of 6,030 US facilities that reported. Up from 29,260 t in 2011.

Related pages

New York energyAll facilities in the state→Bayswater Peaking Facility60.5 MW operating capacity→ Jamaica Bay Peaking60.5 MW operating capacity→ Wheelabrator Westchester LP59.7 MW operating capacity→ Curtis Palmer Hydroelectric59.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming