Fuel spend$32.4M2023 · estimate
Capacity in service30.0MW1 unit · gas
Net generation129GWh2023 · reported
CO₂ emitted307,675t2023 · reported to EPA · 1,221st highest of 6,030 in the US
Rank in Florida#233 (tied)of 310 · by capacity · #4,011 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor49%2023
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is WestRock CP, LLC - Seminole Mill (Formerly Smurfit-Stone)?
30.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by
Westrock Co (100%) and operated by WestRock Seminole, filed as commercial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1957.
When is it due to retire?
No retirement date has been filed for any operating unit at WestRock CP, LLC - Seminole Mill (Formerly Smurfit-Stone). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $32.4M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
307,675 t in 2023, reported to the EPA — the 1,221st highest of 6,030 US facilities that reported. Up from 118,701 t in 2011.