Fuel spend$157,4102023 · estimate
Capacity in service24.0MW3 units · gas + oil
Net generation3.36GWh2023 · reported
Rank in Kansas#78of 173 · by capacity · #4,248 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor2%2023
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Wellington 1?
24.0 MW across 3 generating units in service — 20.0 MW of natural gas and 4.0 MW of oil. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Wellington - (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1977. The oldest operating unit is Unit 4 (1972); the newest are Unit 7 and Unit 8 (2004).
When is it due to retire?
No retirement date has been filed for any operating unit at Wellington 1. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $157,410 in 2023 — natural gas $156,812 and oil & petroleum $599. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.