AMERICAN ENERGY ATLAS
Industrial + power·Kansas

City of Winfield Ks.

Winfield, Cowley County, Kansas · SPP · operated by City of Winfield - (KS) · owned by City of Winfield Kansas

last reported to the EPA in 2017

2023 · headline year
Capacity in service26.5MW1 unit · gas · 1 more on standby or out of service
Net generation3.7GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2017
Rank in Kansas#77of 173 · by capacity · #4,159 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Cowley County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 46,266 MMBtu · reported

CO₂ emitted, t · 2011–17

05,00010,00015,000201120142017
Reported (through 2017)

Generating units

2 of 2 shown · 26.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 426.5Natural GasNatural Gas Steam Turbine1970Operating
Unit 51.6Distillate oilPetroleum Liquids2002Standby

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Winfield Kansas · 100%
Operating utility
City of Winfield - (KS)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Natural Gas and Natural Gas Liquids Suppliers, Power Plants
EPA facility ID
1006486
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Enable Gas Transmission LLC
EIA plant ID
7013

Common questions

How big is City of Winfield Ks.?
26.5 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by City of Winfield Kansas (100%) and operated by City of Winfield - (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1970.
When is it due to retire?
No retirement date has been filed for any operating unit at City of Winfield Ks. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

Kansas energyAll facilities in the state→Iola29.3 MW operating capacity→ Jameson Energy Center27.6 MW operating capacity→ Wellington 124.0 MW operating capacity→ Sabetha Power Plant21.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming