Power·Massachusetts
Waters River
Peabody, Essex County, Massachusetts · ISO-NE · operated by City of Peabody - (MA)
last reported to the EPA in 2015
2023 · headline year
Capacity in service64.9MW2 units · gas
Net generation4.31GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2015
Rank in Massachusetts#25of 666 · by capacity · #3,158 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor1%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
77% Natural gas · 41,795 MMBtu · reported23% Oil & petroleum · 12,798 MMBtu · reported
Natural gas supplies 77% of the fuel energy it burned in 2023.
CO₂ emitted, t · 2011–15
Reported (through 2015)
Generating units
2 of 2 shown · 64.9 MW in service
All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023. 26 deliveries are on record for 2011–2012.
Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.
See the delivery history →
In the Atlas
- Spend and volume trend5 years
- Suppliers and contracts3 suppliers, 26 deliveries
- Monthly receipts23 months
Open in the Atlas →
Ownership & operations
- Operating utility
- City of Peabody - (MA)
- Entity type
- Municipally Owned Utility
- Regulatory status
- Regulated
- Industry sector
- Power Plants
- EPA facility ID
- 1000666
- Balancing authority
- ISO-NE
- NERC region
- NPCC
- Gas pipeline
- Tennessee Gas Pipeline Company
- EIA plant ID
- 1678
Common questions
How big is Waters River?
64.9 MW across 2 generating units in service.
Who owns and operates it?
Operated by City of Peabody - (MA), filed as municipally owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit 1 (1971); the newest is Unit 2 (1990).
When is it due to retire?
Planned retirement dates are filed for 1 of 2 operating units: Unit 1 (2026).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
Related pages
Select a state