AMERICAN ENERGY ATLAS
Power·Wisconsin

Washington Island

Door County, Wisconsin · MISO · operated by Washington Island El Coop, Inc

2023 · headline year
Fuel spend$3,6692023 · estimate
Capacity in service5.0MW7 units · oil
Net generation9MWh2023 · reported
Rank in Wisconsin#138 (tied)of 258 · by capacity · #6,619 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 174 MMBtu · reported · $3,669 est.

Reported fuel consumption, MMBtu · 2011–2023

01,0002,0003,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 5.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 71.6Distillate oilPetroleum Liquids1997Operating
Unit 81.6Distillate oilPetroleum Liquids1997Operating
Unit 60.9Distillate oilPetroleum Liquids1972Operating
Unit 50.5Distillate oilPetroleum Liquids1968Operating
Unit 40.2Distillate oilPetroleum Liquids1951Operating
Unit 20.1Distillate oilPetroleum Liquids1952Operating
Unit 30.1Distillate oilPetroleum Liquids1945Operating

All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Washington Island El Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
4148

Common questions

How big is Washington Island?
5.0 MW across 7 generating units in service.
Who owns and operates it?
Operated by Washington Island El Coop, Inc, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. The oldest operating unit is Unit 3 (1945); the newest are Unit 7 and Unit 8 (1997).
When is it due to retire?
No retirement date has been filed for any operating unit at Washington Island. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $3,669 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Wisconsin energyAll facilities in the state→Portage Industrial Battery5.0 MW operating capacity→ Rock LakeSolar WI, LLC5.0 MW operating capacity→ Stevens Point Mill4.8 MW operating capacity→ Waste Management of Wisconsin, Inc.4.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming