AMERICAN ENERGY ATLAS
Industrial + power·Wisconsin

Stevens Point Mill

Stevens Point, Portage County, Wisconsin · MISO · operated by Consolidated Water Power Co · owned by Pixelle Specialty Solutions Inc

2023 · headline year
Fuel spend$5.38M2023 · estimate
Capacity in service4.8MW6 units · hydro
CO₂ emitted74,419t2023 · reported to EPA · 2,914th highest of 6,030 in the US
Rank in Wisconsin#147 (tied)of 258 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Portage County · MISO · MRO

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 10.8WaterConventional Hydroelectric1918Operating
Unit 20.8WaterConventional Hydroelectric1918Operating
Unit 30.8WaterConventional Hydroelectric1918Operating
Unit 40.8WaterConventional Hydroelectric1918Operating
Unit 50.8WaterConventional Hydroelectric1918Operating
Unit 60.8WaterConventional Hydroelectric1918Operating

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Pixelle Specialty Solutions Inc · 100%
Operating utility
Consolidated Water Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Pulp and Paper
EPA facility ID
1006193
Balancing authority
MISO
NERC region
MRO
EIA plant ID
3973

Common questions

How big is Stevens Point Mill?
4.8 MW across 6 generating units in service.
Who owns and operates it?
Owned by Pixelle Specialty Solutions Inc (100%) and operated by Consolidated Water Power Co, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1918. Every operating unit came online in 1918.
When is it due to retire?
No retirement date has been filed for any operating unit at Stevens Point Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
How much does it spend on fuel?
An estimated $5.38M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
74,419 t in 2023, reported to the EPA — the 2,914th highest of 6,030 US facilities that reported. Down from 80,620 t in 2011.

Related pages

Wisconsin energyAll facilities in the state→Rock LakeSolar WI, LLC5.0 MW operating capacity→ Washington Island5.0 MW operating capacity→ Waste Management of Wisconsin, Inc.4.8 MW operating capacity→ Kaukauna City Hydro4.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming