AMERICAN ENERGY ATLAS
Power·South Carolina

W S Lee

Williamston, Anderson County, South Carolina · DUK · operated by Duke Energy Carolinas, LLC · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$204M2023 · reported deliveries
Capacity in service955MW5 units · gas
Net generation5.96TWh2023 · reported
CO₂ emitted2.34Mt2023 · reported to EPA · 244th highest of 6,030 in the US
Rank in South Carolina#11of 204 · by capacity · #324 of 13,147 US
Reported suppliers72023 · 38 deliveries
Capacity factor71%2023

Location

Anderson County · DUK · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 42.8 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

11 of 11 shown · 955 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST10362.1Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit CT11242.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit CT12242.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 754.0Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 854.0Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 3163.2Natural GasNatural Gas Steam Turbine1958Retired 2022
Unit 190.0Bituminous coalConventional Steam Coal1951Retired 2014
Unit 290.0Bituminous coalConventional Steam Coal1951Retired 2014
Unit 435.1Natural GasNatural Gas Fired Combustion Turbine1978Retired 2007
Unit 535.1Natural GasNatural Gas Fired Combustion Turbine1968Retired 2007
Unit 635.1Natural GasNatural Gas Fired Combustion Turbine1968Retired 2007

All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 7 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
VitolNatural gas14.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 7 suppliers. Subscribe to see all 7, every one of the 404 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 7 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Carolinas, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000908
Balancing authority
DUK
NERC region
SERC
EIA plant ID
3264

Common questions

How big is W S Lee?
955 MW across 5 generating units in service. A further 6 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Carolinas, LLC, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating units are Unit 7 and Unit 8 (2007); the newest are Unit ST10, Unit CT11 and Unit CT12 (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at W S Lee. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 7 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $204M in 2023.
How much CO₂ does it emit?
2.34 Mt in 2023, reported to the EPA — the 244th highest of 6,030 US facilities that reported. Up from 736,124 t in 2011.

Related pages

South Carolina energyAll facilities in the state→V C Summer1,030 MW operating capacity→ Broad River Energy Center985 MW operating capacity→ Mill Creek Combustion Turbine Sta799 MW operating capacity→ Jocassee774 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming