Mill Creek Combustion Turbine Sta

Blacksburg, Cherokee County, South Carolina · DUK · operated by Duke Energy Carolinas, LLC · owned by Duke Energy Corp

2023 · headline year
Fuel spend$3.39M2023 · estimate
Capacity in service799MW8 units · gas
Net generation38.5GWh2023 · reported
CO₂ emitted29,422t2023 · reported to EPA · 4,800th highest of 6,030 in the US
Rank in South Carolina#12of 204 · by capacity · #410 of 13,147 US
Reported suppliers72023 · 78 deliveries
Capacity factor1%2023

Location

Cherokee County · DUK · SERC

What it burns

2023 · reported

Share of reported fuel consumption

95% Natural gas · 534,348 MMBtu · reported · $2.76M est.5% Oil & petroleum · 26,420 MMBtu · reported · $632,502 est.

Natural gas supplies 95% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 799 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 199.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 299.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 399.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 499.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 599.9Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 699.9Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 799.9Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 899.9Natural GasNatural Gas Fired Combustion Turbine2003Operating

All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

1 of 7 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
Hightower PetroleumOil & petroleum249,523n/an/aTruck

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 7 suppliers. Subscribe to see all 7, every one of the 608 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 7 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Carolinas, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000163
Balancing authority
DUK
NERC region
SERC
EIA plant ID
7981

Common questions

How big is Mill Creek Combustion Turbine Sta?
799 MW across 8 generating units in service.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Carolinas, LLC, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit 1, Unit 2, Unit 3 and Unit 4 (2002); the newest are Unit 5, Unit 6, Unit 7 and Unit 8 (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Mill Creek Combustion Turbine Sta. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum. Natural gas and oil & petroleum came from 7 suppliers in 2023.
How much does it spend on fuel?
An estimated $3.39M in 2023 — natural gas $2.76M and oil & petroleum $632,502. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
29,422 t in 2023, reported to the EPA — the 4,800th highest of 6,030 US facilities that reported. Down from 91,106 t in 2011.

Related pages

South Carolina energyAll facilities in the state→Broad River Energy Center985 MW operating capacity→ W S Lee955 MW operating capacity→ Jocassee774 MW operating capacity→ Wateree772 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming