AMERICAN ENERGY ATLAS
Power·Texas

W A Parish

Thompsons, Fort Bend County, Texas · ERCOT · operated by NRG Texas Power LLC (EIA plant 3470) and Petra Nova Power I LLC (EIA plant 58378) · owned by NRG Energy Inc

2023 · headline year

The largest power plant in Texas by capacity — 4,091 MW, 83% coal by fuel energy in 2023, first unit online in 1958, newest in 2013.

Fuel spend$264M2023 · estimate
Capacity in service4,091MW10 units · coal + gas
Net generation10.9TWh2023 · reported
CO₂ emitted10.1Mt2023 · reported to EPA · 14th highest of 6,030 in the US
Rank in Texas#1of 941 · by capacity · #5 of 13,147 US
Reported suppliers52023 · 90 deliveries
Capacity factor30%2023

Location

Fort Bend County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

83% Coal · 107 TBtu · reported · $207M est.17% Natural gas · 21.2 TBtu · reported · $57.3M est.

Coal supplies 83% of the fuel energy it burned in 2023. Per unit of heat, natural gas costs W A Parish an estimated 1.4× more than coal.

CO₂ emitted, Mt · 2011–2023

0102030201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 4,091 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 5734.1SubbituminousConventional Steam Coal1977Operating
Unit 6734.1SubbituminousConventional Steam Coal1978Operating
Unit 8654.0SubbituminousConventional Steam Coal1982Operating
Unit 7614.6SubbituminousConventional Steam Coal1980Operating
Unit 4580.5Natural GasNatural Gas Steam Turbine1968Operating
Unit 3299.2Natural GasNatural Gas Steam Turbine1961Operating
Unit 1187.8Natural GasNatural Gas Steam Turbine1958Operating
Unit 2187.8Natural GasNatural Gas Steam Turbine1958Operating
Unit GT282.2Natural GasNatural Gas Fired Combustion Turbine2013Operating
Unit GT116.3Natural GasNatural Gas Fired Combustion Turbine1967Operating

All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 5 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Coalsales LLCCoal50.83,090,088Rawhide Mine, WyomingRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 5 suppliers. Subscribe to see all 5, every one of the 1,440 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 5 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
NRG Energy Inc · 100%
Operating utilities
NRG Texas Power LLC (EIA plant 3470)
Petra Nova Power I LLC (EIA plant 58378)
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants, Suppliers of CO2
EPA facility ID
1006868
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Kinder Morgan Tejas Pipeline LLC
EIA plant IDs
3470 · 58378

Common questions

How big is W A Parish?
4,091 MW across 10 generating units in service — 2,737 MW of coal and 1,354 MW of natural gas. The total spans EIA plants 3470 and 58378, filed under one facility.
Who owns and operates it?
Owned by NRG Energy Inc (100%) and operated by NRG Texas Power LLC (EIA plant 3470) and Petra Nova Power I LLC (EIA plant 58378), filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1975. The oldest operating units are Unit 1 and Unit 2 (1958); the newest is Unit GT2 (2013).
When is it due to retire?
No retirement date has been filed for any operating unit at W A Parish. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas. Coal delivered in 2023 came from 4 coal suppliers, from mines in Wyoming — principally Rawhide Mine. Other fuels (natural gas) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $264M in 2023 — coal $207M and natural gas $57.3M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
10.1 Mt in 2023, reported to the EPA — the 14th highest of 6,030 US facilities that reported. Down from 17.7 Mt in 2011.

Related pages

Texas energyAll facilities in the state→South Texas Project2,709 MW operating capacity→ Comanche Peak2,430 MW operating capacity→ Martin Lake2,380 MW operating capacity→ Forney Power Plant1,894 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming