AMERICAN ENERGY ATLAS
Power·Vermont

VPPSA Project 10

Franklin County, Vermont · ISO-NE · operated by Vermont Public Power Supply Authority

2023 · headline year

The 3rd-largest power plant in Vermont by capacity — 47.2 MW, 100% oil & petroleum by fuel energy in 2023, first unit online in 2010.

Fuel spend$370,9032023 · estimate
Capacity in service47.2MW2 units · oil
Net generation908MWh2023 · reported
Rank in Vermont#3of 118 · by capacity · #3,604 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Franklin County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 16,812 MMBtu · reported · $370,903 est.

Reported fuel consumption, MMBtu · 2019–23

010,00020,00030,000201920212023
Reported (through 2023)

Generating units

2 of 2 shown · 47.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1251023.6Distillate oilPetroleum Liquids2010Operating
Unit 1251123.6Distillate oilPetroleum Liquids2010Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Vermont Public Power Supply Authority
Entity type
Political Subdivision
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
63203

Common questions

How big is VPPSA Project 10?
47.2 MW across 2 generating units in service.
Who owns and operates it?
Operated by Vermont Public Power Supply Authority, filed as political subdivision.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at VPPSA Project 10. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $370,903 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Vermont energyAll facilities in the state→Kingdom Community Wind65.0 MW operating capacity→ J C McNeil59.5 MW operating capacity→ Green Mountain Power Berlin41.8 MW operating capacity→ Bellows Falls40.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming