Burlington, Chittenden County, Vermont · ISO-NE · operated by City of Burlington Electric - (VT)
last reported to the EPA in 2012
2023 · headline year
The 2nd-largest power plant in Vermont by capacity — 59.5 MW, 100% biomass by fuel energy in 2023, first unit online in 1984.
Capacity in service59.5MW1 unit · biomass
Net generation185GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2012
Rank in Vermont#2of 118 · by capacity · #3,272 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor35%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Biomass · 2.72 TBtu · reported
CO₂ emitted, t · 2011–12
Reported (through 2012)
Generating units
1 of 1 shown · 59.5 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
59.5
Wood
Wood/Wood Waste Biomass
1984
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.
City of Burlington Electric - (VT) 50% of 1 unit Green Mountain Power Corp 31% of 1 unit Vermont Public Power Supply Authority 19% of 1 unit
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001474
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Vermont Gas Systems Inc
EIA plant ID
589
Common questions
How big is J C McNeil?
59.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by City of Burlington Electric - (VT), filed as municipally owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984.
When is it due to retire?
No retirement date has been filed for any operating unit at J C McNeil. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?