AMERICAN ENERGY ATLAS
Power·Vermont

J C McNeil

Burlington, Chittenden County, Vermont · ISO-NE · operated by City of Burlington Electric - (VT)

last reported to the EPA in 2012

2023 · headline year

The 2nd-largest power plant in Vermont by capacity — 59.5 MW, 100% biomass by fuel energy in 2023, first unit online in 1984.

Capacity in service59.5MW1 unit · biomass
Net generation185GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2012
Rank in Vermont#2of 118 · by capacity · #3,272 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor35%2023

Location

Chittenden County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.72 TBtu · reported

CO₂ emitted, t · 2011–12

05,00010,00015,00020112012
Reported (through 2012)

Generating units

1 of 1 shown · 59.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 159.5WoodWood/Wood Waste Biomass1984Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 26 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Burlington Electric - (VT)
Jointly held units
City of Burlington Electric - (VT) 50% of 1 unit
Green Mountain Power Corp 31% of 1 unit
Vermont Public Power Supply Authority 19% of 1 unit
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001474
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Vermont Gas Systems Inc
EIA plant ID
589

Common questions

How big is J C McNeil?
59.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by City of Burlington Electric - (VT), filed as municipally owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984.
When is it due to retire?
No retirement date has been filed for any operating unit at J C McNeil. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Vermont energyAll facilities in the state→Kingdom Community Wind65.0 MW operating capacity→ VPPSA Project 1047.2 MW operating capacity→ Green Mountain Power Berlin41.8 MW operating capacity→ Bellows Falls40.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming