AMERICAN ENERGY ATLAS
Power·Michigan

Vestaburg

Montcalm County, Michigan · MISO · operated by Wolverine Power Supply Coop

2023 · headline year
Fuel spend$68,3642023 · estimate
Capacity in service23.7MW1 unit · gas
Net generation1.41GWh2023 · reported
Rank in Michigan#91 (tied)of 258 · by capacity · #4,266 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Montcalm County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 23,602 MMBtu · reported · $66,108 est.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 23.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 823.7Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit 63.0Distillate oilPetroleum Liquids1959Retired 2017
Unit 73.0Distillate oilPetroleum Liquids1960Retired 2017
Unit 40.7Distillate oilPetroleum Liquids1939Retired 2007
Unit 50.7Distillate oilPetroleum Liquids1941Retired 2007
Unit 20.3Distillate oilPetroleum Liquids1939Retired 2007

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wolverine Power Supply Coop
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
1881

Common questions

How big is Vestaburg?
23.7 MW across 1 generating unit in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Wolverine Power Supply Coop, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1972.
When is it due to retire?
No retirement date has been filed for any operating unit at Vestaburg. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $68,364 in 2023 — natural gas $66,108 and oil & petroleum $2,256. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Michigan energyAll facilities in the state→Claude Vandyke24.8 MW operating capacity→ Saint Marys Falls23.7 MW operating capacity→ Gladstone22.6 MW operating capacity→ Zeeland22.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming