AMERICAN ENERGY ATLAS
Power·Michigan

Claude Vandyke

Allegan County, Michigan · MISO · operated by Wolverine Power Supply Coop

2023 · headline year
Fuel spend$165,7512023 · estimate
Capacity in service24.8MW1 unit · gas
Net generation3.9GWh2023 · reported
Rank in Michigan#90of 258 · by capacity · #4,237 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor2%2023

Location

Allegan County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 59,177 MMBtu · reported · $165,751 est.

Reported fuel consumption, MMBtu · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 24.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 824.8Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit 623.0Natural GasNatural Gas Fired Combined Cycle1967Retired 2019
Unit 53.5Natural GasNatural Gas Internal Combustion Engine1959Retired 2003

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wolverine Power Supply Coop
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
1880

Common questions

How big is Claude Vandyke?
24.8 MW across 1 generating unit in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Wolverine Power Supply Coop, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2001.
When is it due to retire?
No retirement date has been filed for any operating unit at Claude Vandyke. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $165,751 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Michigan energyAll facilities in the state→Demille Solar Farm28.4 MW operating capacity→ Heritage Garden Wind Farm I LLC28.0 MW operating capacity→ Saint Marys Falls23.7 MW operating capacity→ Vestaburg23.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming