Tiverton, Newport County, Rhode Island · ISO-NE · operated by Tiverton Power LLC · owned by Carlyle Group Management LLC
2023 · headline year
The 3rd-largest power plant in Rhode Island by capacity — 290 MW, 100% natural gas by fuel energy in 2023, first unit online in 2000.
Fuel spend$45.4M2023 · estimate
Capacity in service290MW2 units · gas
Net generation1.65TWh2023 · reported
CO₂ emitted630,574t2023 · reported to EPA · 823rd highest of 6,030 in the US
Rank in Rhode Island#3of 105 · by capacity · #1,056 of 13,147 US
Reported suppliers92023 · 108 deliveries
Capacity factor65%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 12 TBtu · reported · $45.4M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 290 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit UNT1
196.9
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit UNT2
93.2
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit UNT3
196.6
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
Unit UNT4
93.2
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 9 suppliers. Subscribe to see all 9, every one of the 491 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
290 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Carlyle Group Management LLC (100%) and operated by Tiverton Power LLC, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. Every operating unit came online in 2000.
When is it due to retire?
No retirement date has been filed for any operating unit at Tiverton Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 9 suppliers in 2023.
How much does it spend on fuel?
An estimated $45.4M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
630,574 t in 2023, reported to the EPA — the 823rd highest of 6,030 US facilities that reported. Up from 627,437 t in 2011.