Scottsville, Fluvanna County, Virginia · PJM · operated by Tenaska Virginia Partners LP · owned by Tenaska Inc

2023 · headline year
Fuel spend$105M2023 · estimate
Capacity in service1,011MW4 units · gas
Net generation3.93TWh2023 · reported
CO₂ emitted1.53Mt2023 · reported to EPA · 403rd highest of 6,030 in the US
Rank in Virginia#8of 230 · by capacity · #304 of 13,147 US
Reported suppliers12023 · 15 deliveries
Capacity factor44%2023

Location

Fluvanna County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 28.3 TBtu · reported · $105M est.

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 1,011 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit STG1390.4Natural GasNatural Gas Fired Combined Cycle2004Operating
Unit CTG1207.0Natural GasNatural Gas Fired Combined Cycle2004Operating
Unit CTG2207.0Natural GasNatural Gas Fired Combined Cycle2004Operating
Unit CTG3207.0Natural GasNatural Gas Fired Combined Cycle2004Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
CoralNatural gas, Oil & petroleum28.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

The supplier is shown. Subscribe to see every one of the 156 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Tenaska Inc
Operating utility
Tenaska Virginia Partners LP
Jointly held units
TC Virginia GP LLC <1% of 4 units
Tenaska TVP General, LLC <1% of 4 units
Tenaska Virginia I LP 99% of 4 units
Tenaska Virginia Inc <1% of 4 units
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000818
Balancing authority
PJM
NERC region
SERC
Gas pipeline
Transcontinental Gas Pipeline
EIA plant ID
55439

Common questions

How big is Tenaska Virginia Generating Station?
1,011 MW across 4 generating units in service.
Who owns and operates it?
Owned by Tenaska Inc and operated by Tenaska Virginia Partners LP, filed as independent power producer. 4 owner stakes are filed on jointly held units.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. Every operating unit came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Tenaska Virginia Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $105M in 2023 — natural gas $105M and oil & petroleum $821,380. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.53 Mt in 2023, reported to the EPA — the 403rd highest of 6,030 US facilities that reported. Down from 1.73 Mt in 2011.

Related pages

Virginia energyAll facilities in the state→Brunswick County Power Station1,472 MW operating capacity→ Doswell Limited Partnership1,313 MW operating capacity→ Ladysmith Combustion Turbine Sta892 MW operating capacity→ Clover Power Station848 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming