Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
The supplier is shown. Subscribe to see every one of the 210 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Dominion Energy Inc (100%) and operated by Virginia Electric & Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating units are Unit 1 and Unit 2 (2001); the newest is Unit 5 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Ladysmith Combustion Turbine Sta. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum. Natural gas and oil & petroleum came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $34.3M in 2023.
How much CO₂ does it emit?
471,194 t in 2023, reported to the EPA — the 969th highest of 6,030 US facilities that reported. Up from 220,842 t in 2011.