AMERICAN ENERGY ATLAS
Power·Massachusetts

Syncarpha Westminster Hybrid CSG

Worcester County, Massachusetts · ISO-NE · operated by Syncarpha Westminster, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service7.6MW2 units · solar + storage
Rank in Massachusetts#92 (tied)of 666 · by capacity · #6,023 (tied) of 13,147 US

Location

Worcester County · ISO-NE · NPCC

Generating units

2 of 2 shown · 7.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SYWES4.7SolarSolar Photovoltaic2022Operating
Unit SYWEB2.9StorageBatteries2023Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Syncarpha Westminster, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
62971

Common questions

How big is Syncarpha Westminster Hybrid CSG?
7.6 MW across 2 generating units in service — 4.7 MW of solar and 2.9 MW of storage.
Who owns and operates it?
Operated by Syncarpha Westminster, LLC, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. The oldest operating unit is Unit SYWES (2022); the newest is Unit SYWEB (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Syncarpha Westminster Hybrid CSG. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (4.7 MW) and Batteries (2.9 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Massachusetts energyAll facilities in the state→UMass Boston7.8 MW operating capacity→ Mt. Tom Solar Project Hybrid7.6 MW operating capacity→ Partridge Solar7.5 MW operating capacity→ Skyline Solar7.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming