AMERICAN ENERGY ATLAS
Industrial + power·New York

Sylvamo Ticonderoga Mill

Ticonderoga, Essex County, New York · NYISO · operated by Sylvamo North America LLC · owned by Sylvamo North America LLC

2023 · headline year
Fuel spend$35.9M2023 · estimate
Capacity in service42.1MW1 unit · gas
Net generation177GWh2023 · reported
CO₂ emitted231,764t2023 · reported to EPA · 1,428th highest of 6,030 in the US
Rank in New York#111of 1,018 · by capacity · #3,708 of 13,147 US
Reported suppliersNot reported2023
Capacity factor48%2023

Location

Essex County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

60% Natural gas · 2.48 TBtu · reported · $30.8M est.33% Black liquor · 1.36 TBtu · reported7% Oil & petroleum · 0.302 TBtu · reported · $5.07M est.

Natural gas supplies 60% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 42.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN142.1Natural GasNatural Gas Steam Turbine1970Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Sylvamo North America LLC · 100%
Operating utility
Sylvamo North America LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper, Waste
EPA facility ID
1006885
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
54099

Common questions

How big is Sylvamo Ticonderoga Mill?
42.1 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Sylvamo North America LLC (100%) and operated by Sylvamo North America LLC, filed as industrial.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1970.
When is it due to retire?
No retirement date has been filed for any operating unit at Sylvamo Ticonderoga Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas, black liquor and oil & petroleum.
How much does it spend on fuel?
An estimated $35.9M in 2023 — natural gas $30.8M and oil & petroleum $5.07M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
231,764 t in 2023, reported to the EPA — the 1,428th highest of 6,030 US facilities that reported. Down from 305,919 t in 2011.

Related pages

New York energyAll facilities in the state→Hudson Falls Hydroelectric Project44.0 MW operating capacity→ Riverbay Corp. - Co-Op City43.5 MW operating capacity→ Shoemaker Gas Turbine41.9 MW operating capacity→ Onondaga Co Resource Recovery Facility39.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming