AMERICAN ENERGY ATLAS
Industrial + power·New York

Onondaga Co Resource Recovery Facility

Jamesville, Onondaga County, New York · NYISO · operated by Covanta Onondega LP · owned by Covanta Holding Corp

2023 · headline year
Capacity in service39.5MW1 unit · waste
Net generation225GWh2023 · reported
CO₂ emitted179,378t2023 · reported to EPA · 1,639th highest of 6,030 in the US
Rank in New York#113of 1,018 · by capacity · #3,798 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor65%2023

Location

Onondaga County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 3.97 TBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 39.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN139.5Municipal solid wasteMunicipal Solid Waste1994Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Covanta Holding Corp · 100%
Operating utility
Covanta Onondega LP
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1006772
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
50662

Common questions

How big is Onondaga Co Resource Recovery Facility?
39.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Covanta Holding Corp (100%) and operated by Covanta Onondega LP, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Onondaga Co Resource Recovery Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much CO₂ does it emit?
179,378 t in 2023, reported to the EPA — the 1,639th highest of 6,030 US facilities that reported. Up from 143,615 t in 2011.

Related pages

New York energyAll facilities in the state→Sylvamo Ticonderoga Mill42.1 MW operating capacity→ Shoemaker Gas Turbine41.9 MW operating capacity→ School Street38.8 MW operating capacity→ Stewarts Bridge38.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming